Skip to Content

Classification Search

Print page
Classification Phraseology as of:
9/1/2023
 
Classification Code:
7538
 
Phraseology:

ELECTRIC POWER LINE CONSTRUCTION — by contractor

Footnote:

This classification applies to the construction, maintenance or repair of aerial power lines, including but not limited to erecting poles or towers, installing service transformers, stringing wires and making service connections. This classification also applies to the installation of aerial power lines for electric trams, trolleys or buses.

The construction, maintenance or repair of aerial power lines by electric power companies in connection with their own operations shall be classified as 7539, Electric Power Companies.

The installation of electrical wiring within buildings shall be separately classified as 5140/5190, Electrical Wiring.

The construction of underground power lines shall be separately classified as 6325, Conduit Construction or Underground Wiring.

Aerial line construction for telephone, television, communication, data, fire alarm or similar low voltage or fiber optic networks shall be separately classified as 7601, Aerial Line Construction.

Industry Group/Related Classifications:
Approved Pure Premium Rate:
To learn how approved pure premium rates are different than insurer rates, click here.
Effective DatePure Premium RateNote
9/1/2023$2.13New/Renewal
9/1/2022$2.13New/Renewal
9/1/2021$2.30New/Renewal
Prior Phraseology and Footnote:
Shown below is the previously published phraseology and footnoteEffective Date

ELECTRIC LIGHT OR POWER LINE CONSTRUCTION

1/1/2016
New Search

The Classification Search was developed by the WCIRB for your convenience to help you identify Standard Classifications based on keywords or a classification code. However, you cannot rely solely on the Classification Search and must make an independent assessment when determining the appropriate classification(s) assignable to a risk in accordance with the USRP.