PILE DRIVING
This classification applies to driving concrete, steel or wood piles into the earth to provide foundation support for buildings or other structures.
Pile driving operations in connection with wharf building shall be classified as 6003(2), Wharf Building.
Building foundation preparation work, including but not limited to the drilling of foundation holes and the subsequent construction of poured in place foundation piers to completion of the substructure, including incidental pile driving, shall be classified as 6258, Foundation Preparation Work.
Shown below is the previously published phraseology and footnote | Effective Date |
---|---|
PILE DRIVING This classification applies to employers engaged in driving concrete, steel or wood piles into the earth to provide foundation support for buildings and structures. Pile driving operations in connection with wharf building shall be classified as 6003(2), Wharf Building. Building foundation preparation work, including but not limited to the drilling of foundation holes and the subsequent construction of poured in place foundation piers to completion of the substructure, including incidental pile driving, shall be classified as 6258, Foundation Preparation Work. | 1/1/2018 |
The Classification Search was developed by the WCIRB for your convenience to help you identify Standard Classifications based on keywords or a classification code. However, you cannot rely solely on the Classification Search and must make an independent assessment when determining the appropriate classification(s) assignable to a risk in accordance with the USRP.