6011
Phraseology
DAM CONSTRUCTION — all operations — including dam repair, alteration, seismic retrofitting and demolition
Footnote
This classification applies to the construction or repair of dams, including but not limited to concrete or earth filled dams.
This classification includes the construction of access roads in connection with dam construction.
Tunneling shall be separately classified as 6251, Tunneling or Underground Mining.
Approved Pure Premium Rates
Effective Date | Pure Premium Rate | Note |
---|---|---|
$2.82 | New/Renewal | |
$3.19 | New/Renewal | |
$4.38 | New/Renewal |
Previous Phraseology and Footnote
Phraseology:
DAM CONSTRUCTION — all operations — including dam repair, alteration, seismic retrofitting and demolition
Footnote:
This classification applies to the construction and repair of dams, including but not limited to concrete and earth filled dams.
This classification includes the construction of access roads in connection with dam construction.
Tunneling shall be separately classified as 6251, Tunneling.