5201(2)

Concrete or Cement Work pouring or finishing of concrete floor slabs does not equal or exceed

Classification Code

5201(2)

Latest Pure Premium Rate
$7.39
Pure Premium Rate Effective Date

Phraseology

CONCRETE OR CEMENT WORK — pouring or finishing of concrete floor slabs, poured in place and on the ground, and concrete slab-type foundations, for other than concrete buildings or structural steel buildings of multi-story construction — including the making or stripping of forms — employees whose regular hourly wage does not equal or exceed $32.00 per hour

Footnote

This classification applies to the pouring or finishing of concrete foundations, footings and slabs for residential buildings not exceeding three stories in height. This classification also applies to the pouring or finishing of concrete slab foundations, with or without integrated footings, for one or two story wood framed or masonry commercial buildings and single story structural steel commercial buildings. This classification includes the incidental installation of reinforcing steel by the employer engaged in the pouring or finishing of concrete flatwork.

This classification also applies to the installation and removal of forms at the job site whether performed by the employer engaged in the pouring or finishing of concrete or by a separate employer.

This classification also applies to the pouring or finishing of lightweight cellular concrete floors within buildings.

The pouring or finishing of concrete floor slabs, foundations, retaining walls, basement walls and/or footings in connection with the construction of poured in place concrete buildings, residential buildings exceeding three stories in height, masonry commercial buildings exceeding two stories in height, and multi-story structural steel buildings, shall be separately classified as 5213, Concrete Construction — N.O.C.

Approved Pure Premium Rates

Effective Date Pure Premium Rate Note
$7.39 New/Renewal
$7.68 New/Renewal
$6.64 New/Renewal

Previous Phraseology and Footnote

Effective Date

Phraseology:

CONCRETE OR CEMENT WORK — pouring or finishing of concrete floor slabs, poured in place and on the ground, and concrete slab-type foundations, for other than concrete buildings or structural steel buildings of multi-story construction — including the making or stripping of forms — employees whose regular hourly wage does not equal or exceed $28.00 per hour

Assignment of this classification is subject to verification at the time of final audit that the employee's regular hourly wage equals or exceeds $25.00 per hour. The payroll of an employee whose hourly wage is not shown to equal or exceed $25.00 per hour shall be classified as 5201(2), Concrete or Cement Work.

Footnote:

This classification applies to the pouring or finishing of concrete foundations, footings and slabs residential buildings not exceeding three stories in height. This classification also applies to the pouring or finishing of concrete slab foundations, with or without integrated footings, for one or two story wood framed or masonry commercial buildings and single story structural steel commercial buildings. This classification includes the incidental installation of reinforcing steel by the employer engaged in the pouring or finishing of concrete flatwork.

This classification also applies to the installation and removal of forms at the job site whether performed by the employer engaged in the pouring or finishing of concrete or by a separate employer.

This classification also applies to the pouring or finishing of lightweight cellular concrete floors within buildings.

The pouring or finishing of concrete floor slabs, foundations, retaining walls, basement walls and/or footings in connection with the construction of poured in place concrete buildings, residential buildings exceeding three stories in height, masonry commercial buildings exceeding two stories in height, and multi-story structural steel buildings, shall be separately classified as 5213, Concrete Construction — N.O.C.